Risk Register Template NZ (Free Example + How to Use It)

Download the Winsland risk register template

FREE DOWNLOAD HERE

risk register

How to use the risk register template

risk meeting graphic 2
  • Use a team to populate the register
  • Potential consequence – make it worst realistic case
  • Untreated risk – assess assuming there are no controls
  • Residual risk – assess risk assuming controls are in place
  • Note: in Winsland template, the rating populates automatically when the likelihood and consequence ratings are added.

Register used to record critical risks

The risk register is where the organisation can maintain its records of how critical risk was identified and the associated controls, as detailed HERE

critical risk

Managing controls through the Winsland APP

risk5

The Winsland health and safety app can also be used to manage the recording of risks and controls and is the preferred means of doing so as it links the controls to monitoring

Details on the Winsland Health and Safety APP are here